Optimasi Produksi Alat Gali, Muat, Angkut Serta Penimbunan Overburden Tahun 2019 di PT Firman Ketaun Desa Tanjung dalam Kecamatan Ulok Kupai Kabupaten Bengkulu Utara Provinsi Bengkulu

Yunizar Permana, Dono Guntoro, Solihin Solihin

Abstract


Abstract. PT Firman Ketaun is a company engaged in coal mining. The company has a land area is divided into two WIUP with KW license number P00163 has an area of 959.6 Ha and KW 96P0204 with area of 300 Ha located in Tanjung Village Ulok Kupai district, North Bengkulu Regency. The purpose of making this thesis is to find out the amount of overburden volume, plan the extent of the disposal area, and plan the maximum distance from location of the overburden excavation to disposal area. The overburden mining system implemented by PT Firman Ketaun is backfilling. Total actual overburden volume from PIT A 2,510,153.14 CCM / year, PIT B 2,079,354.98 CCM / year, and PIT C 1,649,601.71 CCM / year. After optimization, total overburden volume of the planned PIT A 4,505,517.90 CCM/year, PIT B 3,085,197.54 CCM/year, and PIT C 2,207,629.14 CCM / year. The disposal area planned for PIT A 2,769,478.60 m2, PIT B 1,095,195.27 m2, and PIT C 5,276,600.27 m2. The total is 5,276,600,57 m2. Maximum average distance after optimization from overburden excavation sites to the disposal area at PIT A ± 522.32 m, PIT B ± 372.23 m, and PIT C ± 193.34 m.

Keywords: Mechanical Equipment, Mining Technique, Disposal Area.

Abstrak. PT Firman Ketaun adalah suatu perusahaan yang bergerak di bidang pertambangan batubara. Perusahaan ini mempunyai luas lahan yang terbagi menjadi dua (2) WIUP dengan no izin KW P00163 memiliki luas wilayah 959,6 Ha dan KW 96P0204 dengan luas wilayah 300 Ha yang terletak di Desa Tanjung Dalam Kecamatan Ulok Kupai, Kabupaten Bengkulu Utara. Tujuan dari skripsi ini yaitu untuk mengetahui jumlah volume overburden dari hasil penggalian, merencanakan luasan area disposal, dan merencanakan jarak maksimum dari lokasi penggalian overburden ke area disposal. Sistem penambangan overburden yang diterapkan oleh PT Firman Ketaun yaitu backfilling. Jumlah volume overburden aktual hasil penggalian PIT A yaitu 2.510.153,14 CCM/tahun, PIT B yaitu 2.079.354,98 CCM/tahun, dan PIT C yaitu 1.649.601,71 CCM/tahun. Setelah dioptimasi, jumlah produksi overburden rencana hasil penggalian PIT A yaitu 4.505.517,90 CCM/tahun, PIT B yaitu 3.085.197,54 CCM/tahun, dan PIT C yaitu 2.207.629,14 CCM/tahun. Luas area disposal yang direncanakan pada PIT A yaitu 2.769.478,60 m2, PIT B yaitu 1.095.195,27 m2, dan PIT C yaitu 5.276.600.27 m2. Total keseluruhan yaitu 5.276.600,57 m2. Jarak maksimum rata-rata setelah optimasi dari lokasi penggalian overburden ke area disposal pada PIT A ± 522,32 m, PIT B ± 372,23 m, dan PIT C ± 193,34 m.

Kata Kunci: Alat Mekanis, Teknis Penambangan, Area Disposal.


Keywords


Alat Mekanis, Teknis Penambangan, Area Disposal.

Full Text:

PDF

References


Aashto, 1965, “Manual Rural High Way Designâ€, Amerika Serikat.

Anwar, H.Z., dan Kesumadhama, S., 1991, “Kontruksi Jalan di Daerah Pegunungan Tropisâ€, Makalah Ikatan Ahli Geologi Indonesia.

Arif, Irwandy., 2013, “Batubara Indonesiaâ€, Indonesia Mining Institute, Bandung.

Caterpillar., 2002, “Caterpillar Performance Handbook Edition 33â€, Caterpillar Inc, USA.

Hartman, H.L. (1987), “Introductory Mining Engineeringâ€, John Wiley & Sons, Singapore.

Komatsu., 2003, “Specification and Aplication Handbook Edition 24â€, Komatsu, Japan.

Komatsu (1996), “Spesifications and Applications Handbookâ€, Edition 17.

Kusuma, Roni Cahya., 2014., “Evaluasi desain tahap 1 disposal SWD 11 PIT 116 tambang batubara distrik bayaâ€, Fakultas Teknik Geologi Universitas Diponegoro., Semarang.

Landong, C., Nurhakim, Dwiatmoko, M. U., Melati, S., 2016., “Perencanaan Disposal Pada Tambang Terbuka Batubaraâ€, Geosapta, Vol 2, 49-55.

Lenoard, Joseph., 1991, “Coal Preparation 5th Editionâ€, Society for mining metallurgy, USA

Pangular, D., 1985, “Petunjuk Penyelidikan & Penanggulangan Gerakan Tanahâ€, Pusat Penelitian dan Pengembangan Pengairan, Balitbang Departemen.

Peurifoy,R.L., Ledbetter, W.B., Schexnayder,C.J.1996. “Construction Planning, Equipment and Methodsâ€, McGraw-Hill. New York.5th Edition.

Prodjosoemarto, Partanto. Ir., 1993., “Pemindahan Tanah Mekanisâ€, Instittut Teknologi Bandung.

Prodjosumarto, Partanto. Ir., 1993, “Tambang terbukaâ€, Jurusan Teknik Pertambangan Fakultas Teknologi Mineral, Institut Teknologi bandung.

Rosyianti, Susy fatena. 2008. “Alat Berat untuk Kontruksiâ€, Cet 1 Edisi 2, Rineka Cipta Jakarta.

Siska., 1996., “Pemindahan Tanah Mekanis (Alat-alat Berat)â€, Bandung.

Sukandarrumidi. Ir., 2008, “Batubara dan Gambutâ€, Gadjah Mada University Press, Jogja.

Sunarno, P. 2008., “Standard Job Procedure Perencanaan dan Pelaksanaan Disposalâ€. Mining Departement. PT Inco Tbk.: Sorowako.




DOI: http://dx.doi.org/10.29313/pertambangan.v0i0.20163

Flag Counter    Â