Author Details
Maryanto, Maryanto, Faculty of Engineering, Mining Engineering, Bandung Islamic University, Indonesia
-
Vol 2, No 1, Prosiding Teknik Pertambangan (Februari, 2016) - Artikel
PIT Design Based On The Value Of Stripping Ratio 5:1 In. PT. Winner Prima Sekata, In The Village Kunangan, District Muara Tebo, Province Jambi
Abstract
PDF (Bahasa Indonesia)
-
Vol 2, No 1, Prosiding Teknik Pertambangan (Februari, 2016) - Artikel
The Stability Evaluation of Tunnel Based On Geotechnical Modelling and And Pull Out Test Methods At Site Kencana PT Nusa Halmahera Minerals, North Halmahera District, North Moluccas Province
Abstract
PDF (Bahasa Indonesia)
-
Vol 2, No 1, Prosiding Teknik Pertambangan (Februari, 2016) - Artikel
PIT Design And Sequencing Pit Mine Of Coal Mining At PT Lithoindo Job Site PT Trimata Benua Tungkal Ilir Sub-District, Banyuasin District Sumatera Selatan Province
Abstract
PDF (Bahasa Indonesia)
-
Vol 2, No 1, Prosiding Teknik Pertambangan (Februari, 2016) - Artikel
Mine Planning And Processing Andesite Stone CV Jaya Baya Batu Persada Malingping Utara Malingping Subdistrict, Lebak Regency Banten Province
Abstract
PDF (Bahasa Indonesia)
-
Vol 2, No 2, Prosiding Teknik Pertambangan (Agustus, 2016) - Artikel
Studi Geoteknik untuk Mendukung Pengembangan Penambangan Batubara di Wilayah IUP PT Bara Anugerah Sejahtera Daerah Penambangan Pulau Panggung, Kabupaten Muara Enim, Provinsi Sumatera Selatan
Abstract
PDF (Bahasa Indonesia)