Page Header

User
Font Size

Keywords BESR II, Economic SR, Pit Design BWE, Productivity, Target Ban, Dump Truck, TKPH, TUR, Lifetime Biaya Produksi, Aliran Kas, NPV, IRR, PBP CSS (Closed Side Setting), Crushing plant, Produktivitas, Efisiensi Kerja Cassiterite, Levels, Variable Crushing Plan, Production, Productivity, Productin Rate Index Crushing Plant, Produktivitas Debit Air, Dimensi Paritan, Sistem Dewatering, Pemompaan, Kapasitas Sump Jalan Angkut, Geometri Jalan Korosi, Pipa Transportasi, Laju Korosi, Remaining Service Life Net Present Value (NPV), Internal Rate of Return (IRR) dan Pay Back Period (PBP), Discounted Cash Flow (DCF), dan analisis sensitivitas Net Present Value (NPV), Internal Rate of Return (IRR), Payback Periode (PBP), Discounted Cash Flow (DCF), Analisis Sensitivitas. Pipa Baja Karbon, Crude Oil, Jenis Korosi, Laju Korosi, Sisa Umur Pakai Pipa Baja Karbon, Crude Oil, Jenis Korosi, Pengendalian Korosi, Laju Korosi, Sisa Umur Pakai Pipa Baja Karbon, Gas, Jenis Korosi, Pengendalian Korosi, Laju Korosi, Sisa Umur Pakai Pipa Baja Karbon, Gas, Laju Korosi, Sisa Umur Pakai. Pipa Baja, Crude Oil, API 5L Grade B, Laju Korosi, Sisa Umur Pakai Pipa Reflektan Vitrinit, Nilai Kalori, dan Peringkat Batubara. Rencana Reklamasi, Rencana Teknis, Anggaran Biaya crushing plant, Roller, Hopper, Belt Conveyor, Loosematerials
Proceeding Content

Browse
  • By Issue
  • By Author
  • By Title
  • Other Journals
Notifications
  • View
  • Subscribe
Proceedings Help

 

 
  • Home
  • About
  • Login
  • Register
  • Search
  • Current
  • Archives
  • Announcements
Home > Archives > Vol 3, No 2, Prosiding Teknik Pertambangan (Agustus, 2017)

Vol 3, No 2, Prosiding Teknik Pertambangan (Agustus, 2017)

DOI: http://dx.doi.org/10.29313/pertambangan.v0i0

  • Table of Contents

Cover Page


Flag Counter