Analisis Kinerja Pabrik Peremuk (Crushing Plant) Batuan Andesit dalam Upaya Memaksimalkan Kapasitas Produksi di PT Lotus SG Lestari

Baradipo Gantara, Linda Pulungan, Dono Guntoro

Abstract


Abstract. Crushing plant is one of the processing unit that consist of many tools which continue cycle and it aims to reduce small materials, that process is the beginning step and most important things of comminution process. Peformence Analysis of Crushing Plan A with heavy equipment productivity which some actual fact are aims to know between work peformence of heavy equipment with production target. Productivity of crushing plan can be worse when some troble in crushing plan are happen at a time, the biggest impact of that trouble is The production does not according with target planned. For example, company set target production at 5805 ton/day but the actual fact just 5506,312 ton/day. The result calculation at Primary Crushing step: Mechanical Avability (MA)= 98,21 %, Physical Avability (PA) = 82,32 %, Use of Avability (UA)= 82,06%, Effective of Utilization (EU)= 80,85%,  Production rate Index (PRI)= 89,335%,Overal Equipment Effectiveness (OEE)= 87,736 %. The result calculation at Secondary Crushing step: Mechanical Avability (MA)= 98,33%, Physical Avability (PA) = 80,92%, Use of Avability (UA)= 98,64%, Effective of Utilization (EU)= 80,85%,  Production rate Index (PRI)= 88,206%,Overal Equipment Effectiveness (OEE)= 86,88%. The result Calculation at Tertiery Crushing step:  Mechanical Avability (MA)= 98,33%, Physical Avability (PA) = 80,92%, Use of Avability (UA)= 98,64%, Effective of Utilization (EU)= 80,85%,  Production rate Index (PRI)= 79,315%,Overal Equipment Effectiveness (OEE)= 80,52%.

 

Abstrak. Pabrik peremuk (Crushing Plant) adalah suatu unit pengolahan yang terdiri dari berbagai macam alat dimana terdapat beberapa rangkaian kegiatan yang bersifat kontinu dan bertujuan untuk mereduksi ukuran material, proses penghancuran tersebut merupakan tahapan awal dan paling penting dalam proses kominusi. Analisis kinerja crushing plant A terhadap produktivitas alat berdasarkan paramater–paramater yang didapat di lapangan bertujuan untuk mengetahui pencapaian kinerja alat terhadap target yang ditentukan oleh perusahaan untuk nantinya akan dilakukan perbaikan-perbaikan sehingga target yang ditetapkan oleh perusahaan bisa dicapai. Beberapa masalah yang terjadi di crushing plant saat proses produksi berlangsung berdampak langsung terhadap produktifivas crushing plant tersebut, dampak yang sangat fatal yaitu target produksi yang tidak tercapai dimana produksi crushing plant saat ini sebesar 5506,312 ton/hari sedangkan target produksi yang telah ditetapkan oleh perusahaan adalah 5805 ton/hari. Pada tahap primary crushing diperoleh hasil Mechanical Avability (MA) = 98,21%, Phyisical Avability (PA) = 94,78%, Use of Avability (UA) = 98,31%, Effective of Utilization (EU) = 93,18%, dan Production rate index (PRI) = 98,577%, Overall Equipment Effectiveness (OEE) = 95,71%. Pada tahap secondary crushing dihasilkan Mechanical Avability (MA) = 98,50%, Phyisical Avability (PA) = 89,62%, Use of Avability (UA) = 98,66%, Effective of Utilization (EU) = 88,41%, dan Production rate index (PRI) = 93,158%, Overall Equipment Effectiveness (OEE) = 91,76%. Selanjutnya pada tahap tertiery crushing  diperoleh hasil Mechanical Avability (MA) = 98,50%, Phyisical Avability (PA) = 89,62%, Use of Avability (UA) = 98,66%, Effective of Utilization (EU) = 88,41%, dan Production rate index (PRI) = 83,229%, Overall Equipment Effectiveness (OEE) = 81,98%.


Keywords


Crushing Plan, Production, Productivity, Productin Rate Index, Overal Equipment Effectiveness

References


CEMA, 2007, “Belt Conveyor For Bulk Materialâ€, Conveyor Equipment Manufacture Association., United State Of America.

Currie, John M, 1973, “Unit Operasi in Mineral Processingâ€, CSM Press, Columbia.

Gustav, Tarjan, 1981, “Mineral Processing Technologyâ€, Akademia Kiado, Budapest.

Toha, Juanda, 2002, “Konveyor sabuk dan peralatan pendukungâ€, PT JUNTO Engineering, Bandung, Indonesia.

Prodjosumarto, Partanto, 1993, “Pemindahan Tanah Mekanisâ€, Jurusan Teknik Pertambangan, Institut Teknologi Bandung.

Prodjosumarto, Partanto dan Zaenal., 2006, “Tambang Terbukaâ€, Jurusan Teknik Pertambangan, Universitas Islam Bandung.

Tobing, 2005, Prinsip Dasar Pengolahan Bahan Galian (Mineral Dressing).

Trimax Machinery Team, “The Birth Of New Dawn (Product Catalog)†,Bekasi, Indonesia.




DOI: http://dx.doi.org/10.29313/pertambangan.v0i0.4846

Flag Counter    Â