Perencanaan Sistem Dewatering pada Tambang Terbuka di PT Batu Sampurna Makmur, Desa Cipinang, Kecamatan Rumpin, Kabupaten Bogor, Provinsi Jawa Barat

Arya Ihsanudin, Yunus Ashari, Noor Fauzi Isniarno

Abstract


Abstract : PT Batu Sampurna Makmur is a mining company with open mining methods for andesite mining. However, the unavailability of the mine drainage system has caused flooding at the mining site, which makes mining activities more important in the rainy season. The purpose of the research is to overcome the potential of water entering the Pit. For water handling in the Pit that is planning a mine drainage system with pumping systems and reservoirs. The data used are 2013-2017 rainfall data, topographic maps, land use maps, pencent slope maps and specification pump. Pit has 2 Catchment Areas is Catchment Area Pit dan Catchment Area Outside Pit with a total area of 23,6 Ha. The water runoff plan with the 10 years period, the reults obtained amounted to 20,48 m3/day. Incoming water discharge in January is 0,33 m3 / sec. Sump were made with a volume of 50.669,05 m3, with dimensions of lower length of 86,95 m, upper length of 133,32 m and height of 4 m. The pump uses 3unit of MFC 390 pump. Based on the planned planning the water problem at the research location can be handled.

Keywords : Rainfall, Discharge, Mine Drainage System, Catchment Area, Pump

 

 

Abstrak : PT Batu Sampurna Makmur merupakan salah satu perusahaan pertambangan dengan metode tambang terbuka untuk batuan andesit. Akan tetapi belum tersedianya sistem penyaliran tambang menyebabkan terjadinya banjir pada lokasi penambangan sehingga mengganggu kegiatan penambangan terutama pada musim penghujan. Tujuan dilakukan penelitian adalah menanggulangi potensi air yang masuk ke Pit. Untuk penangulangan air di Pit yaitu merencanakan sistem penyaliran tambang dengan sistem pemompaan dan kolam penampungan. Data yang digunakan merupakan data curah hujan tahun 2013-2017, peta topografi, peta tata guna lahan, peta persen lereng dan spesifikasi pompa. Pit memiliki 2 Catchment Area yaitu Catchment Area Pit dan Catchment Area Luar Pit dengan total luasan sebesar  23,6 Ha. Curah hujan rencana dengan periode ulang hujan 10 tahun, hasilnya ialah sebesar 20,48 mm/hari. Debit air yang masuk pada Bulan Januari ialah sebesar 0,33 m3/detik. Kolam penampungan dibuat dengan volume 50.669,05 m3,dengan dimensi panjang bawah 86,95 m, panjang atas 133,32 m dan ketinggian 4 m. Pompa menggunakan 3 unit pompa MFC 390. Berdasarkan perencanaan yang telah direncanakan masalah air pada lokasi penelitian dapat tertangani.

Kata kunci : Curah Hujan, Debit, Sistem Penyaliran, Catchment Area, Pompa


Keywords


Curah Hujan, Debit, Sistem Penyaliran, Catchment Area, Pompa

Full Text:

PDF

References


Asdak C, 2002. “Hidrologi dan Pengelolaan DASâ€, UGM. Yogyakarta.

Ashari, Y. 2013. Draft Buku Ajar Hidrogeologi Untuk Pertambangan.Jurusan Teknik Pertambangan Universitas Islam Bandung (UNISBA). Bandung.

Binder, Raymond C, 1973, “ Fluid Mechanicâ€, New York.

Chow, V. T. 1961. A general formula for hydrologic frequency analysis,Trans. Am. Geophys. Union.

Darcy, H. 1985. Hydraulic Researches, Experimental research on flow of water In open channel. Academie des Sciences. Paris.

Fetter, C.W. 1988. Applied Hydrogeology (4th Edition). Fourth Edition.London : Prentice Hall.

Gumbel, E. J. 1954. Statistical Theory Of Extreme Value and some Practical Applications. National Bereau of standars (U.S) Appl Math. Ser., 33.

Janna, William, 2013, “ Design of Flud Thermal Systemâ€, New York.

Kite, G.W. 1977, “SLURP Hydrological Modelâ€,Canadian Journal of Civil Engineering. Canada.

Manning, R. 1981. On The Flow of Water in Open Channel and Pipes. Civ,Eng, Irenland.

Manning and Delp, 1991, “Major Diagnosis Fisikâ€, Jakarta.

Moody, L. F. 1944, "Friction Factors for Pipe Flowâ€, Transactions of the American Society of Mechanical Engineers, New York.

Murtiono, 2008. Kajian Model Estimasi Volume Limpasan Permukaan, Debit Puncak Aliran, dan Erosi Tanah dengan SCS dan MUSLE.

Potter, M, C., Wiggert and David C, 2008, "Schaum's Otline of Fluid Mechanics", The McGraw-Hill Companies, Inc., New York

Sayoga, R. 1993. Pengantar Penirisan Tambang. ITB

Seyhan, E., 1995, “Dasar-dasar Hidrologiâ€, Gadjah Mada University Press, Yogyakarta.

Soewarno, 1995, “ Intensitas Curah Hujanâ€. Yogyakarta.

Suripin, 2004, “Teknik Drainase Perkotaan Yang Berkelanjutanâ€, Penerbit Andi, Yogyakarta.

Suwandhi, Ir., M. Sc., Awang. 2008. “Modul Perencanaan Sistem Penyaliran Tambangâ€. Bandung.

Triatmojo, Bambang. 2003. “Hidrolika I & IIâ€. Jakarta.

Wentworth, C.K., 1922, “A Scale Of Grade and Class Terms for Clastics Sedimentsâ€, University Of Chicago Press, Chicago.

Widyasari, T., 2009, “Kurva Intensitas Durasi Frekuensi (IDF) Persamaan Mononobe di Kabupaten Slemanâ€, Universitas Janabadra, Yogyakarta.




DOI: http://dx.doi.org/10.29313/pertambangan.v0i0.19595