Meminimumkan Biaya Produksi Menggunakan Perencanaan Agregat pada CV. Moonsoon Wear Industries

Astri Refa Febryanti, Nining Koesdiningsih, Asni Mustika Rani

Abstract


Abstract. Production planning used as the first step when the company will do the production process. CV. Moonsoon Wear Industries is a company in convection that produces clothing. The purpose of this study is to able to plan the production process and calculate alternative aggregate planning strategies that can minimize production costs to maximize profits. This aggregate planning strategy uses 4 methods that is Level Aggregate Plan, Chase Aggregate Plan, Hybrid Aggregate Plan, Subcontracting. The results of calculations using the Level Aggregate Plan method with a total cost of Rp 4.070.359.250, the Hybrid Aggregate Plan method with a total cost of Rp. 4.104.924.250 and Subcontracting with a total cost of     Rp. 4.478.565.500, while Chase Aggregate Plan has the lowest cost of Rp. 4.059.295.500. The Chase Aggregate Plan method is more efficient with a difference of 8% compared to the current production planning strategy used by the company, which is Rp. 4.415.071.500. This method should be used by companies in order to reduce production costs.

Keywords: Aggregate Planning,  Level Aggregate Plan, Chase Aggregate Plan, Hybrid Aggregate Plan

Abstrak. Perencanaan produksi digunakan sebagai langkah awal ketika perusahaan akan melakukan proses produksi. CV. Moonsoon Waer Industries adalah  perusahaan dibidang konveksi yang memproduksi pakaian. Tujuan dari penelitian ini yaitu dapat merencanakan proses produksi dan menghitung alternatif strategi perencanaan agregat yang dapat meminimumkan biaya produksi untuk memaksimalkan keuntungan. Strategi perencanaan agregat ini menggunakan 4 metode yaitu Level Aggregate Plan, Chase Aggregate Plan, Hybrid Aggregate Plan, dan Subcontracting. Hasil perhitungan dengan metode Level Aggregate Plan dengan total biaya Rp. 4.070.359.250, metode Hybrid Aggregate Plan dengan total biaya Rp. 4.104.924.250, dan Subcontracting dengan total biaya Rp. 4.478.565.500, sedangkan  Chase Aggregate Plan memiliki biaya paling rendah yaitu sebesar Rp. 4.059.295.500.  Metode Chase Aggregate Plan  lebih efisien dengan selisih 8% dibandingkan dengan strategi perencanaan produksi yang dipakai oleh perusahaan saat ini yaitu sebesar Rp. 4.415.071.500. Metode ini sebaiknya digunakan oleh perusahaan agar dapat mengurangi biaya produksi.

Kata Kunci: Perencanaan Agregat,  Level Aggregate Plan, Chase Aggregate Plan, Hybrid Aggregate Plan


Keywords


Perencanaan Agregat, Level Aggregate Plan, Chase Aggregate Plan, Hybrid Aggregate Plan

Full Text:

PDF

References


Akhmad. 2018. Manajemen Operasi, Edisi 1. Bogor: Azkiya Publishing.

Heizer, Jay and Barry Render. 2016. Manajemen Operasi, Manajemen Keberlangsungan dan Rantai Pasokan, Edisi 11, Alih Bahasa Hirson Kurnia, Ratna Saraswati, dan David Wijaya . Jakarta: Salemba Empat

R. Dan Reid & Nada R. Sanders. 2013. Operations Management, 5th Edition. Newyork: John Wiley & Sons

Schroeder Roger G. And Susan Meyer Goldstein. 2018. Operations Management In The Supply Chain: Decision And Cases , Seventh Edition. NewYork: McGraw-Hill Education.

Stevenson, William J & Sum Chee Chuong. 2014. Manajemen Operasi Perspektif Asia, Edisi 9 Buku 1. Jakarta: Salemba Empat.




DOI: http://dx.doi.org/10.29313/.v0i0.18008

Flag Counter   Â