Minimization of Lead Time Production with Lean Manufacturing Approach in PT Indofarma (Persero) Tbk (A Case Study of piroxicam 20 mg Capsules)
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Conner, G., 2001. Lean Manufacturing for the Small Shop. Dearbon, Michigan: Society of Manufacturing Engineers.
Feld, W. M., 2001. Lean Manufacturing: Tools, Techniques, and How to Use Them. United State of America: CRC Press
Gaspersz, V., 2007. Lean Sigma For Manufacturing And Service Industries. PT Gramedia Pustaka Utama. Jakarta.
Liker, J. K., 2006. The Toyota Way : 14 Prinsip Dari Perusahaan Manufaktur Terhebat Di Dunia. Erlangga. Jakarta.
Liker, J. K., dan Meiler, D., 2006. The Toyota Way (Fildbook). Penerbitan Erlangga. Jakarta.
Monden, Y., 1993. Sistem Produksi Toyota : Suatu Perencanaan Terpadu Untuk Penerapan Just-In-Time. Pustaka Binaman
Pressindo. Jakarta.
Ohno, T., 1995. Toyota Production System, Beyond Large-Scale Production. Terjemahan: Dr Edi Nugroho, Pustaka Binaan Pressindo.
Womack, J, P., dan Daniel, T. J., 1996. Lean Thinking : Banish Waste And Create Weatlh In Your Corporation, Revised and Update, Second Edition. New York.
Womack, J, P., dan Daniel, T. J., dan Roos, D; 1991. The Machine That Change The World. Harper Collins Publishers. New York
DOI: http://dx.doi.org/10.29313/ti.v0i0.2914
  Â